• The detailed
front end design and preparation of specification
for the
replacement control system on a 6MW LT chiller plant
a major brewery
• Review of cooling loads and preparation of
a specification to tender
for a major food factory modification.
• A review of options and the preparation of
the specifications for the
replacement HT & LT refrigeration plants at a
major UK chocolate factory.
|